Fast fashion lives and dies by speed.
Most delays don’t come from production. They come from confusion in product development.
Common problems teams face:
- Scattered Excel files
- Long email threads
- Outdated tech packs reaching suppliers
- Too many sample iterations
This is where PLM (Product Lifecycle Management) actually helps.
What PLM Does in Simple Terms
PLM brings design, tech packs, costing, timelines, and supplier communication into one shared system.
Everyone works on the same information at the same time.
No version confusion. No rework.
Where PLM Saves the Most Time
1. Faster Design Decisions
Instead of sharing designs through emails:
- Designs, feedback, and approvals live in one place
- Merchandising and sourcing teams can review instantly
This reduces design approval cycles by days.
2. Tech Packs Update Instantly
Without PLM:
- Every change creates a new Excel or PDF
- Suppliers often work on old versions
With PLM:
- Measurements, BOM, and colours update once
- Suppliers always see the latest version
This removes errors and speeds up vendor handover.
3. Teams Work in Parallel
Traditional flow:
Design, then sourcing, then costing, then production
With PLM:
- Design, costing, and sourcing happen together
- Everyone sees updates in real time
This removes waiting time between departments.
4. Sampling Takes Fewer Rounds
Sampling delays slow everything down.
PLM helps by:
- Clearly tracking sample status
- Centralising feedback and revisions
- Reducing miscommunication with vendors
This shortens the sampling cycle significantly.
5. Faster Supplier Communication
Instead of emails and attachments:
- Suppliers access specs, dates, and updates directly
- Changes are visible immediately
This leads to faster responses and fewer misunderstandings.
6. Early Cost and Margin Visibility
Late cost surprises cause delays.
PLM allows:
- Live BOM costing
- Cost impact visibility during the design stage
This enables faster go or no go decisions.
7. Clear Timelines and Accountability
PLM tracks:
- Critical path
- Delays and bottlenecks
- Ownership at every stage
Problems are identified early instead of at the last minute.
The Real Impact Teams See
- 20 to 40 percent faster time to market
- Fewer sampling iterations
- Less rework and fewer mistakes
- Better supplier alignment
TL;DR
PLM speeds up fast fashion by removing confusion, duplication, and waiting time from product development.
Submitted December 17, 2025 at 01:52AM by Illustrious_Dare127 https://ift.tt/gfDsxvl
No comments:
Post a Comment